• Sep 20, 2019 News!IJMMM Had Implemented Online Submission System, Please Submit New Submissions through This System Only!   [Click]
  • Feb 26, 2018 News!'Writing Tips' shared by Prof. Ian McAndrew!   [Click]
  • Mar 23, 2021 News!Vol. 7, No. 2 has been indexed byInspec (IET)!   [Click]
General Information
    • ISSN: 1793-8198 (Print)
    • Abbreviated Title: Int. J. Mater. Mech. Manuf.
    • Frequency: Bimonthly
    • DOI: 10.18178/IJMMM
    • Editor-in-Chief: Prof. Ian McAndrew
    • Co-editor-in-Chief: Prof. K. M. Gupta
    • Executive Editor: Cherry L. Chen
    • Abstracting/Indexing: Inspec (IET), Chemical Abstracts Services (CAS),  ProQuest, Crossref, Ulrich's Periodicals Directory,  EBSCO.
    • E-mail ijmmm@ejournal.net

Editor-in-chief
Prof. Ian McAndrew
Capitol Technology University, USA
It is my honor to be the editor-in-chief of IJMMM. I will do my best to work with the editorial team and help make this journal better.

IJMMM 2017 Vol.5(4): 270-277 ISSN: 1793-8198
DOI: 10.18178/ijmmm.2017.5.4.332

Developing Annual Overhaul Decisions for Turbo Machinery under a Cost Value Approach

Chung Yeh and Yu-Tang Lee
Abstract—The purpose of this study is to develop annual overhaul decisions and refine overhaul instruction sustain availability for the turbo-machinery industry under consideration of cost. Taguchi’s orthogonal array was used to calculate the cost and make comparisons between factors, resulting in the best combination of factors from the full factorial experiment method. The cost-value approach was used to determine the requirements for each candidate, the cost of implementing the availability, and the value of the availability. Finally, the determined levels of factors resulted in the optimal combination, which mapped to the direct cost and cost value, In practice, a decision tree is utilized to determine, while new factors are added with regard to decision-making or risk-taking. This research is based on a case study from the turbo machinery industry, but the approach and results can be adapted to other maintenance industries, as well. The overhaul instruction model was developed through a trade-off between cost evaluation and quality management to perform the overhaul of turbo-machinery, in which the quality system, ISO9001: 2000, is used to demonstrate the overhaul steps to meet all requirements.

Index Terms—Turbo machinery, orthogonal array, availability, cost value approach, overhaul instruction.

Yu-Tang Lee is with Feng Chia University, Taiwan, Republic of China (R.O.C.) (e-mail: the.lees527@gmail.com).

[PDF]

Cite: Chung Yeh and Yu-Tang Lee, "Developing Annual Overhaul Decisions for Turbo Machinery under a Cost Value Approach," International Journal of Materials, Mechanics and Manufacturing vol. 5, no. 4, pp. 270-277, 2017.

Copyright © 2008-2020. International Journal of Materials, Mechanics and Manufacturing. All rights reserved.
E-mail: ijmmm@ejournal.net